Tomorrow, I finally have a day with nothing planned. So today after dropping off the kitten to get spayed, I went to Hamshaw Lumber and bought some bead-board panels. My hope is to get the interior wall paneled and the door into its final position. You may remember me mentioning the interior door whose construction cost me several valuable hours of my precious life. In the end it turned out quite nice. It is very rustic looking and opens and closes smoothly. Currently, the door is tacked into place awaiting final positioning once the paneling is in place. Every little bit moves us closer to a real brewery...
Friday, February 24, 2012
Tuesday, February 14, 2012
Yeast Quest
Those of you who know me well know that while living in Alaska I was a big fan of the White Labs liquid yeast cultures. I was pretty bummed out when I moved down and could not find a source of White Labs products, though I have found some amazing dry yeasts. So you can imagine that I was pretty excited when I recently managed to get my hands on some White Labs cultures.
Unfortunately,the joy was short lived. The first culture I used showed no activity after 24 hours. So I pitched a dry yeast in the wort but it was too late. Bacteria had taken hold and the beer was terrible. To avoid a repeat, I tried to make a starter with the next one.
Once again, the culture proved completely nonviable. Literally, nothing happened. Out of curiosity, I let the starter sit for over two weeks. Still nothing! At least I know I was properly sanitizing my glassware.
Happily, since those failures, the next two cultures have worked well. What the difference was I cannot say. The only factor I cannot account for is temperature. I did let the wort cool longer on the third and fourth tries. Perhaps, I pitched the first two cultures at too high a temperature. At the very least, perhaps the difference between the temperature of the wort and the yeast was too great and some sort of thermal shock killed the culture.
I hope I can figure this out as I really like the results I get with White Labs yeasts.
Saturday, January 28, 2012
Building Walls
Last week I took two days off work to try to get some work done on the brewery. This weekend I tried to finish what I started. Well, I did not get as far as I wanted, but then I always plan for too much. What I have got done was pretty good.
I build and framed an interior door. This is quite a task if, if one has not done it before. In the end it took a surprising amount of time to complete. However, now that it is done it looks pretty good.
The other task I accomplished was framing the partition wall. Since we plan to have a sales area, we needed to have an interior wall to separate the brewing and sales areas. This was not too difficult a task. The only problem was that since it is 9'4" from the concrete floor to the joists above I had to build the wall and then build a short extension to connect it to the floor above.
So I accomplished a good bit of work over the last two weekends. Hopefully, I will soon have some more videos and pictures to post.